Skip to main content

Aran Honeycomb

Cable Knitting Stitches » Aran Honeycomb

The Aran Honeycomb stitch is worked over a multiples of 8 sts.
Row 1 - right side: Knit
Row 2: Purl.
Row 3: * 2/2RC, 2/2LC; repeat from * to end.
Row 4: Purl.
Row 5: Knit.
Row 6: Purl.
Row 7: * 2/2LC, 2/2RC; repeat from * to end.
Row 8: Purl.
Repeat rows 1 - 8.


Abbreviations:
2/2 LC: Slip 2 sts to CN and hold in front, K2, then K2 from CN.
2/2 RC: Slip 2 sts to CN and hold in back, K2, then K2 from CN.

Comments

Popular posts from this blog

Cable Panel 11: Hearts

Cable Panel 18: Saxon Braid

The Saxon Braid is worked over 28 stitches. Row 1: P4, (2/2RC, p4) 3times. All even number rows: Knit the knit stitches and purl the purl stitches. Row 3: P3, 2/1RPC, (2/2LPC, 2/2RPC) twice, 2/1LPC, p3. Row 5: P2, 2/1RPC, p3, 2/2LC, p4, 2/2LC, p3, 2/1LPC, p2. Row 7: P2, k2, p3, 2/1RPC, 2/2LPC, 2/2RPC, 2/1LPC, p3, k2, p2. Row 9: P2, (k2, p3) twice, 2/2RC, (p3, k2) twice, p2. Row 11: P2, k2, p3, 2/1LPC, 2/2RPC, 2/2LPC, 2/1RPC, p3, k2, p2. Row 13: P2, 2/1LPC, p3, 2/2LC, p4, 2/2LC, p3, 2/1RPC, p2. Row 15: P3, 2/1LPC, (2/2RPC, 2/2LPC) twice, 2/1RPC, p3. Repeat Rows 1 - 16. Abbreviations: 2/2 LC: Slip 2 sts to CN and hold in front, K2, then K2 from CN. 2/2 RC: Slip 2 sts to CN and hold in back, K2, then K2 from CN. 2/1 LPC: Slip 2 sts to CN and  hold in font, P1, then K2 from CN. 2/1 RPC: Slip 1 st to CN and hold in back, K2, then P1 from CN. 2/2 LPC: Slip 2 sts to CN and hold in front, P2, then K2 from CN. 2/2 RPC: Slip 2 sts to CN and hold in back, K2, then P2 from CN.

Cable Panel 16: Moss Stitch Diamonds