Skip to main content

Slipped Hourglass

Cable Knitting Stitches » Twist Stitch » Slipped Hourglass

The Slipped Hourglass stitch is worked over a multiple of 8 sts, + 2.
Row 1 -right side: P1, * p3, k2, p3; rep from * to last st, p1.
All even number rows: Knit all knit sts, slip purlwise with yarn in front all purl sts.
Row 3: P1, * p3, k2, p3; rep from * to last st, p1.
Row 5: P1, * p2, 1/1RPC, 1/1LPC, p2; rep from * to last st, p1.
Row 7: P1, * p1, 1/1RPC, p2, 1/1LPC, p1; rep from * to last st, p1.
Row 9: P1, * 1/1RPC, p4, 1/1LPC; rep from * to last st, p1.
Row 11: P1, * k1, p6, k1; rep from * to last st, p1.
Row 13: P1, * k1, p6, k1; rep from * to last st, p1.
Row 15: P1, * 1/1LPC, p4, 1/1RPC; rep from * to last st, p1.
Row 17: P1, * p1, 1/1LPC, p2, 1/1RPC, p1; rep from * to last st, p1.
Row 19: P1, * p2, 1/1LPC, 1/1RPC, p2; rep from * to last st, p1.
Repeat Rows 1 - 20.

Abbreviations:
1/1RPC: Skip the first stitch, knit the second stitch, leave on needle, then purl the skipped stitch. Slip both stitches from the needle together.
1/1LPC: Skip the first stitch, purl through the backloop the second stitch, then knit the skipped stitch. Slip both stitches from the needle together.

Popular posts from this blog

Cable Panel 11: Hearts

Cable Panel 18: Saxon Braid

The Saxon Braid is worked over 28 stitches. Row 1: P4, (2/2RC, p4) 3times. All even number rows: Knit the knit stitches and purl the purl stitches. Row 3: P3, 2/1RPC, (2/2LPC, 2/2RPC) twice, 2/1LPC, p3. Row 5: P2, 2/1RPC, p3, 2/2LC, p4, 2/2LC, p3, 2/1LPC, p2. Row 7: P2, k2, p3, 2/1RPC, 2/2LPC, 2/2RPC, 2/1LPC, p3, k2, p2. Row 9: P2, (k2, p3) twice, 2/2RC, (p3, k2) twice, p2. Row 11: P2, k2, p3, 2/1LPC, 2/2RPC, 2/2LPC, 2/1RPC, p3, k2, p2. Row 13: P2, 2/1LPC, p3, 2/2LC, p4, 2/2LC, p3, 2/1RPC, p2. Row 15: P3, 2/1LPC, (2/2RPC, 2/2LPC) twice, 2/1RPC, p3. Repeat Rows 1 - 16. Abbreviations: 2/2 LC: Slip 2 sts to CN and hold in front, K2, then K2 from CN. 2/2 RC: Slip 2 sts to CN and hold in back, K2, then K2 from CN. 2/1 LPC: Slip 2 sts to CN and  hold in font, P1, then K2 from CN. 2/1 RPC: Slip 1 st to CN and hold in back, K2, then P1 from CN. 2/2 LPC: Slip 2 sts to CN and hold in front, P2, then K2 from CN. 2/2 RPC: Slip 2 sts to CN and hold in back, K2, then P2 from CN.

Cable Panel 16: Moss Stitch Diamonds